ODBC Scheduled refreshing possible?
Hi all
Is it possible to schedule ODBC connected data sources within PowerBI? I am using desktop version and just wondered if this was at all possible. I haven't done any scheduling yet and it would be super useful
You should be able to do that with an Gateway with the proper ODBC drivers installed.
2 Replies
- Greg_DecklerCommunity Champion
You should be able to do that with an Gateway with the proper ODBC drivers installed.
- AyupchapHelper III
Thanks so much - I now have this working