The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends August 31st. Request your voucher.
It was comfortable to have advanced scheduling scenarios in on-prem solutions. Exactely it means that, I would like to have the possibility to select a time frame during which date a datapipline should run, for example configure triggers that run only during a specific date range (e.g., 1st to 5th of the month) and within a daily time window (e.g., 11:59 AM to 3:59 PM) at an hourly or 2-hourly frequency. There are reports which are used to be calculated in this time period. In order to avoid waisting resources and running the pipeline the whole month.
Please vote! 🙂
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.