Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
It was comfortable to have advanced scheduling scenarios in on-prem solutions. Exactely it means that, I would like to have the possibility to select a time frame during which date a datapipline should run, for example configure triggers that run only during a specific date range (e.g., 1st to 5th of the month) and within a daily time window (e.g., 11:59 AM to 3:59 PM) at an hourly or 2-hourly frequency. There are reports which are used to be calculated in this time period. In order to avoid waisting resources and running the pipeline the whole month.
Please vote! 🙂
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.