Allow scheduler configuration with variable libraries
The new scheduler is a great idea (Unlocking Flexibility in Fabric: Introducing Multiple Scheduler and CI/CD Support | Microsoft Fabric Blog | Microsoft Fabric)
However, the fact that we cannot control this using variable libraries means that if you have scheduled refreshed disabled in dev and test then after every prod deployment you have to renable the refresh.
There is also no way to turn off this new scheduler and go back to the old scheduler which did not move across environments.
Please either enable us to control the scheduler via depoyment pipelines ASAP or give us a tenant switch to disable this till this feature is supported.
8 Comments
- zhayaMicrosoft EmployeeStatus changed:NewtoUnder Review
- hedeencharlesAdvocate Izhaya Tom_Fosterbi This would be a very useful feature!
- zhayaMicrosoft EmployeeStatus changed:Under ReviewtoPlanned
We are planning for a work to allow users control the Scheudler On/Off state with variable library. The ETA would be March 2026. Thank you all for your feedback!
- hedeencharlesAdvocate IThank you for the update zhaya !
- Tom_FosterbiRegular Visitorzhaya is there an update on the ETA of this
- SjoerdWAdvocate IThis would also be useful for pipelines with multiple schedules. Instead of only controlling a single scheduler on/off state, it would be great if the activation state of each schedule could be configured through Variable Libraries. That would allow organizations to define separate DEV, TEST and PROD schedules (for example 06:00, 05:30 and 05:00) and activate only the appropriate schedule in each environment.
- SjoerdWAdvocate IVariable Libraries would become even more powerful if they could control the activation state of individual schedules instead of only a single scheduler. A pipeline can already have multiple schedules. We use: DEV schedule (06:00) TEST schedule (05:30) PROD schedule (05:00) During deployment, only the appropriate schedule should be enabled for the target environment. This avoids manual changes after deployment and eliminates the need to parameterize schedule times. This would fit naturally with Variable Libraries and Deployment Pipelines.
- DanielSDavisFrequent VisitorSjoerdW It looks like Microsoft snuck that feature in on us. I can't find a single thread on it, but it's in the Fabric UI
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v1 hour agoCommunity ChampionNew607Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v9 hours agoCommunity ChampionNew13Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal14019712 hours agoFrequent VisitorNew6Views0likes0Comments