Forum Discussion
Developer mode & git for reports with live connection
Thanks RuiRomanoMS for the reply.
Maby its a separate error then.. I have created a simple report connected to a semantic model in development stage and then, save it as a PBIP, push it to development branch in origin and try to sync the branch in my report workspace i get the following error.
I have used the connect to PBI Semantic model connector.
its only a small table in the report.
The definition file does indeed validate what you said so i guess that looks good?
Hi D_Lav
I didn't check the definition file in such detail.
But I got a different effect.
The synced report works without any issues.
But I cannot edit it in Power BI Desktop after syncing it back from Git.
Perhaps it's the same cause.
I don't know.
- D_Lav2 years agoHelper I
Hi Anonymous
I tried that now aswell. If i publish the report to the workspace with a connection to a semantic model in separate workspace. I can sync the content to git from workspace but not the other way around.
And the reports dont work in pbi desktop after. So same effect as you.
This seem to wonky to work with in real life..