scheduled refresh
now i am gettng a different error with i allow the scheduled refresh to run
ast refresh failed: Thu Apr 14 2022 13:10:58 GMT-0400 (Eastern Daylight Time)
The last refresh attempt failed because of an internal service error. This is usually a transient issue. If you try again later and still see this message, contact support.Hide details
| Cluster URI: | WABI-US-EAST2-redirect.analysis.windows.net |
| Activity ID: | 8d7d3f79-c1a8-4ad9-8ef5-48fc46aa6b32 |
| Request ID: | 7d773705-28b6-43a4-9972-1f7320405c40 |
| Time: | 2022-04-14 17:10:58Z |
Hi, FCF
You should always ensure that basic requirements for refresh are met and verified. These basic requirements include:
- Verify the gateway version is up to date
- Verify the report has a gateway selected - if not, the datasource may have changed or might be missing
Once you've confirmed those requirements are met, take a look through the following documents for more troubleshooting.
https://docs.microsoft.com/power-bi/connect-data/refresh-troubleshooting-refresh-scenarios
Best Regards,
Community Support Team _Charlotte
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
1 Reply
- v-zhangtiCommunity Support
Hi, FCF
You should always ensure that basic requirements for refresh are met and verified. These basic requirements include:
- Verify the gateway version is up to date
- Verify the report has a gateway selected - if not, the datasource may have changed or might be missing
Once you've confirmed those requirements are met, take a look through the following documents for more troubleshooting.
https://docs.microsoft.com/power-bi/connect-data/refresh-troubleshooting-refresh-scenarios