help with burndown chart
- 9 years ago
v-qiuyu-msft, I dont think that line looks quite right. Using the measure I outlined above, the result looks more like a burndown series. I have overlaid the two options for aykim101 to see:
The line needs to continually drop from 133 by the increments of the count column to end at 58 on 31 October. Make sure that Date column is formatted as a date.
Cheers,
Sam
// If this is a solution please mark as such
- 9 years ago
Hi, as MFelix and I alluded to, there needs to be a context for the calculation to take place. The calculations I outlined were in lieu of having a definned 133 so start from. You will need a table with the starting point for each of the burndown eg:
Project | Start point
Project 1 | 133
Project 2 | 150
...
Project n | value
Once you have that then and a relationship between the Project column and the Project column in your data table, you will be able to have the startpoint in your caluclation based on selection eg:
SOLVE WITH MEASURE:
Measure1:
Project Start point measure = FIRSTNONBLANK('Project Table'[Start Point],1)
Measure 2:
[Project Start point measure]-CALCULATE( SUM('Table1'[Count]), FILTER(ALLSELECTED('Table1'[Date]),ISONORAFTER('Table1'[Date], MAX('Table1'[Date]),DESC)))
Perhaps theres more to the origional post? Is the count column of the origional steps meant to sum to 133? If so then you could run a sum of the count column and use that as the starting point. =CALCULATE(SUM(Table1[COUNT]),ALL(Table1[DATE])) and use in lieu of the 133 in the calculation.
Cheers,
Sam
// If this is a solution please mark as such
Hi,
You can do this either by calculated column or measure:
first make sure your date column is a date and that the row currently defined as 'start' has a date in it (You cant have multiple data types in one column). For simplicity when testing I set it as 05/01/2017.
SOLVE BY COLUMN:
133-CALCULATE(sum(Table1[Count]),FILTER(Table1,Table1[Date]<=EARLIER(Table1[Date])))
SOLVE WITH MEASURE:
133-CALCULATE( SUM('Table1'[Count]), FILTER(ALLSELECTED('Table1'[Date]),ISONORAFTER('Table1'[Date], MAX('Table1'[Date]),DESC)))
You can make the starting point dynamic with say a related table of different projects starting points but I am unsure how your model works.