Hi All,

 

I have a stupid question want to know. Right now, I concern to the Azure to get the table and it contain more than 100 columns. I need to filter certain field to get the data I need. Also, some column which are useless for me I will delete it as well.

 

Should I do the filtering in Power Query first or delete those unless column first in order to improve the loading performance?

1 ACCEPTED SOLUTION
AnamPatel
Resolver II
Resolver II

You should start with Removing the extra columns first and then perform Filtering and other operations in Power Query.

 

View solution in original post

2 REPLIES 2
Vijay_A_Verma
Super User
Super User

The operation which leads to reducation in size of rectangle ( i.e. grid of rows and columns) that should be done first. 

Hence, if your data size is 10 rows and 6 columns, then there are 60 cells.

Scenario 1 - If you delete 2 columns, then rectangle size would be 10*4 = 40 cells.

Scenario 2 - If you are able to filter out 4 rows, then rectanble size would be 6*6 = 36 cells 

Hence, in this case 2nd scenario is more beneficial. 

Key rule is that you should do both i.e. reduce columns and reduce rows. Hence, if I am able to delete 2 columns and filter out 4 rows, my rectangle size would be 6*4 = 24 cells.

Now, reduce as much as possible before bringing the data to PQ. If not possible, after bringing the data to PQ, use above principles.

AnamPatel
Resolver II
Resolver II

You should start with Removing the extra columns first and then perform Filtering and other operations in Power Query.

 

Helpful resources

Announcements
Fabric Data Days Carousel

Fabric Data Days

Advance your Data & AI career with 50 days of live learning, contests, hands-on challenges, study groups & certifications and more!

October Power BI Update Carousel

Power BI Monthly Update - October 2025

Check out the October 2025 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors