Forum Discussion
Help with How to Create a Timeline
Hi Community!
I am trying to make a graphic like below. I have multiple studies with three main milestone dates (denoted by colored circles). I need to have a bar that shows the total time the project took (denoted by green, pink and blue lines) and then have some way to show where each of the 3 milestones occurred. Any ideas or suggestions? I've tried various line, bar, Gantt charts but haven't found a close solution.
Thanks for any guidance!
Hello colettb
i would do something like this.
1. create list of date from Start Date up to End Date
2. create calendar table
3. create relationship between two table
4. create a measure define value (this makes the width of column is not too long or else the value will be date format)
Value =
IF(
not ISBLANK(SELECTEDVALUE('Table'[Custom.1])),
1,
0
)5. create two measure for conditonal formating (make background color red and make value transparant)
Color Background =
IF(
[Value]=1,
"#FF0000"
)Color Font =
IF(
not ISBLANK([Value]),
"#FFFFFF00"
)5. assign conditional formatting for background and font
6. create a calculated column to check whether the list of date coincide with any of milestone date
7. assign conditional formating icon
Detail is in pbix.
Hope this will help.
Thank you.
5 Replies
- IrwanSuper User
hello colettb
in my case, i created a multiple date in power query because in power bi you need a value in those days to be filled.
from this value
becomes this value
using this m-code
Table.AddColumn("Previous Step", "Custom", each Table.AddColumn(#"Filled Down", "Custom", each {Number.From([Start])..Number.From([End])}))then you can plot in matrix visual to get that values in between two dates.
Hope this will help.
Thank you.
- IrwanSuper User
Hello colettb
i would do something like this.
1. create list of date from Start Date up to End Date
2. create calendar table
3. create relationship between two table
4. create a measure define value (this makes the width of column is not too long or else the value will be date format)
Value =
IF(
not ISBLANK(SELECTEDVALUE('Table'[Custom.1])),
1,
0
)5. create two measure for conditonal formating (make background color red and make value transparant)
Color Background =
IF(
[Value]=1,
"#FF0000"
)Color Font =
IF(
not ISBLANK([Value]),
"#FFFFFF00"
)5. assign conditional formatting for background and font
6. create a calculated column to check whether the list of date coincide with any of milestone date
7. assign conditional formating icon
Detail is in pbix.
Hope this will help.
Thank you.