Gantt Chart drill down

Hi

 

I hope someone can help.

 

I am trying to use the Gantt chart tools with data from MS project, however as my plans are very detailed and have multiple layers I would like to be able to drill down through the data rather than have every task as a seperate line.

 

I have tried the 3 Gantt chart tools in the market place but none seem to let me drill down, is there something I am missing or is there no current way to drill down in these visuals?

 

Thaks

 

Matt

7 Replies

    • Matt22365's avatar
      Matt22365
      Icon for Resolver III rankResolver III

      Hi

       

      Thats a shame, thank you for your response.

       

      Is there a workaround possible, maybe using a matrix table with conditional formatted cells rather than the Gantt?

       

      Thanks

       

      Matt