Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

The Power BI DataViz World Championships are on! With four chances to enter, you could win a spot in the LIVE Grand Finale in Las Vegas. Show off your skills.

Reply
SUMESHKUMAR22
Helper III
Helper III

GIT Integration with Power BI developer mode

Hi everyone, Happy winter 🙂

My goal is to integrate all my 20+ reports with GIT but currently they are published using PBI desktop & I want to integrate all those reports with GIT repository which means my premium workspace will be connected through GIT.

To follow this approach, I have a 2- problem statement that is,

1. All my reports are saved inside a single local folder. But when it comes to intialize the repository (on VS code) it will consider only .pbip file to specifically track/stage the report changes / artifacts. So manually converting so many pbix into pbip is not efficient . So is there any workaround to convert all the reports at once?

2. How to bulk load all these files in VS and intialize a repo in a one go. Do we have to create a folder and create a single branch and then Pull Request all at once?

Any video reference / workaround blog would be helpful.

Thanks in advance,
Skn

1 ACCEPTED SOLUTION
ShirinArshadnia
Helper II
Helper II
2 REPLIES 2
ShirinArshadnia
Helper II
Helper II

Yeh I have already referred the link before implementing this with a single report. But my question is specific to a scenario where in I have multiple reports to integrate it with GIT during which I have 2 problems which is mentioned above. 

Please refer the question again. Thanks again!

Helpful resources

Announcements
Feb2025 Sticker Challenge

Join our Community Sticker Challenge 2025

If you love stickers, then you will definitely want to check out our Community Sticker Challenge!

Jan NL Carousel

Fabric Community Update - January 2025

Find out what's new and trending in the Fabric community.