Hi all
I have a code where I exclude the weekends to get the networkdays. Can someone help me to additional exclude the holidays which I want to set up in an excel file?
This is my existing code
(StartDate as date, EndDate as date) as number =>
let
ListDates = List.Dates(StartDate, Number.From(EndDate-StartDate), #duration(1, 0, 0, 0)),
RemoveWeekends = List.Select(ListDates, each Date.DayOfWeek(_, Day.Monday) < 5),
CountDays = List.Count(RemoveWeekends)
in
CountDays
Thanks a lot!
Solved! Go to Solution.
(StartDate as date, EndDate as date) as number =>
List.Count(List.Select(List.Dates(StartDate, Number.From(EndDate-StartDate) + 1, #duration(1, 0, 0, 0)), each Date.DayOfWeek(_, Day.Monday) < 5 or not List.Contains(Holidays, _)))
Thanks to the great efforts by MS engineers to simplify syntax of DAX! Most beginners are SUCCESSFULLY MISLED to think that they could easily master DAX; but it turns out that the intricacy of the most frequently used RANKX() is still way beyond their comprehension! |
DAX is simple, but NOT EASY! |
let
ListDates = List.Dates(StartDate, Number.From(EndDate-StartDate) + 1, #duration(1, 0, 0, 0)),
RemoveWeekendsHolidays = List.Select(ListDates, each Date.DayOfWeek(_, Day.Monday) < 5 or not List.Contains(Holidays, _))
CountDays = List.Count(RemoveWeekends)
in
CountDays
(StartDate as date, EndDate as date) as number =>
List.Count(List.Select(List.Dates(StartDate, Number.From(EndDate-StartDate) + 1, #duration(1, 0, 0, 0)), each Date.DayOfWeek(_, Day.Monday) < 5 or not List.Contains(Holidays, _)))
Thanks to the great efforts by MS engineers to simplify syntax of DAX! Most beginners are SUCCESSFULLY MISLED to think that they could easily master DAX; but it turns out that the intricacy of the most frequently used RANKX() is still way beyond their comprehension! |
DAX is simple, but NOT EASY! |
I don't really know how I should put this in my existing code... Could you write it with my existing code
(StartDate as date, EndDate as date) as number =>
List.Count(List.Select(List.Dates(StartDate, Number.From(EndDate-StartDate) + 1, #duration(1, 0, 0, 0)), each Date.DayOfWeek(_, Day.Monday) < 5 or not List.Contains(Holidays, _)))
Thanks to the great efforts by MS engineers to simplify syntax of DAX! Most beginners are SUCCESSFULLY MISLED to think that they could easily master DAX; but it turns out that the intricacy of the most frequently used RANKX() is still way beyond their comprehension! |
DAX is simple, but NOT EASY! |
Thanks a lot! Any idea why the data load takes such a long time? is running for 10min and still didn't load the data...And I only have 3 dates to test in the holiday file.
Hi @jij19,
I'd like to suggest you add buffer functions to these processes to prevent memory leaks and duplicated memory resources spent on these calculations.
Table.Buffer - PowerQuery M | Microsoft Docs
List.Buffer - PowerQuery M | Microsoft Docs
Regards,
Xiaoxin Sheng
March 31 - April 2, 2025, in Las Vegas, Nevada. Use code MSCUST for a $150 discount!
Your insights matter. That’s why we created a quick survey to learn about your experience finding answers to technical questions.
Arun Ulag shares exciting details about the Microsoft Fabric Conference 2025, which will be held in Las Vegas, NV.
User | Count |
---|---|
124 | |
87 | |
85 | |
70 | |
51 |
User | Count |
---|---|
205 | |
153 | |
97 | |
79 | |
69 |