Forum Discussion

powerbiexpert22's avatar
powerbiexpert22
Icon for Impactful Individual rankImpactful Individual
5 months ago
Solved

Estimates for CFO Dashboard

are below questions enough for calculating estimates for CFO Dashboard or i am missing something?

 

Kindly share overall objective or goal of Dashboard 
As per our understanding one Dashboard need to be build in Power BI for CFO Team , kindly confirm. Are there any additional Dasboards or Reports expected to be delivered?
Kindly share approximate number of KPIs or metrics to be shown on Dashboard
What would be the data source for Dashboard,example Snowflake, Excel/CSV etc.?
Are we looking to show near real time information on Dashboard , if yes then what would be the expected latency, example 5 to 10 minutes ?
Is there a requirement to view Dashboard on mobile or tab devices?
Is there a need to integrate or embed Dashboard with CSIS internal application or any portal? 
How many approximate concurrent users would be viewing the Dashboard?
How users would be consuming Dashboard ? Example on Power BI portal or PDF etc
As per our understanding data would be available and ready inside data source for Power BI for preparing Dashboard, kindly confirm
  • Hi powerbiexpert22 

    Overall objective is to provide a centralized financial dashboard for CFO to monitor key metrics like revenue, profitability, cash flow, and financial performance trends for decision making.

    Number of dashboards are One primary CFO dashboard is expected and additional detailed report pages may be included for drilldowns if required.

    KPIs or metrics are approximately 10–20 key financial KPIs like Revenue, EBITDA, Margin %, Cash Flow, Forecast vs Actuals

    Data source so data will be sourced from structured systems such as Snowflake or SQL, with possible Excel inputs for supplementary data.

    Real-time requirement is near real-time is not mandatory and a scheduled refresh like daily or hourly is sufficient unless specified otherwise.

    Device compatibility is primarily desktop usage.

    Integration or embedding so, no embedding required initially and dashboard will be accessed via Power BI Service which can be extended later if needed.

    Concurrent users are Estimated 10–50 users, mainly leadership and finance teams.

    Consumption method is that users will access via Power BI Service and periodic exports like PDF/PPT may be required for reporting.

    Data readiness so sata is expected to be available and mostly clean with minor transformations may be required within Power BI.

3 Replies

  • Hi powerbiexpert22 

    Overall objective is to provide a centralized financial dashboard for CFO to monitor key metrics like revenue, profitability, cash flow, and financial performance trends for decision making.

    Number of dashboards are One primary CFO dashboard is expected and additional detailed report pages may be included for drilldowns if required.

    KPIs or metrics are approximately 10–20 key financial KPIs like Revenue, EBITDA, Margin %, Cash Flow, Forecast vs Actuals

    Data source so data will be sourced from structured systems such as Snowflake or SQL, with possible Excel inputs for supplementary data.

    Real-time requirement is near real-time is not mandatory and a scheduled refresh like daily or hourly is sufficient unless specified otherwise.

    Device compatibility is primarily desktop usage.

    Integration or embedding so, no embedding required initially and dashboard will be accessed via Power BI Service which can be extended later if needed.

    Concurrent users are Estimated 10–50 users, mainly leadership and finance teams.

    Consumption method is that users will access via Power BI Service and periodic exports like PDF/PPT may be required for reporting.

    Data readiness so sata is expected to be available and mostly clean with minor transformations may be required within Power BI.

  • HI powerbiexpert22 ,

    All of these questions really are based on you, your company and your CFO.  What KPI's should be on it?  Well, what matters to your organization and to the CFO?  What is standard in your industry?  How many KPI's matter (and therefore, how many do you need)?

     

    In Power BI there is a difference between a Dashboard and a Report.  Frankly, I would think that if this is for a CFO then a regular report, in an app with a mobile version is the way to go.

     

    You asked about real time?  Well, how often does the CFO really look at this information?  I would be surprised if it is more than 1 time a day, unless you are having some sort of instant sales numbers to track with the volume to warrant this type of report and the licensing required to have something refreshing that often.

     

    All your other questions are quite internal to your organization and CFO - where are your data sources so you know how to obtain the data.  Where does the CFO expect to see the data - in Power BI on their phone, or on a PC at the desk or inside of a separate tool where you need to embed it?

     

    As for examples, just do a quick search on Bing or Google or wherever and search for "examples of CFO report with KPI's" and you will see many, many examples of what other people are doing.

  • Hi powerbiexpert22 

    Your list is a solid foundation it covers the basics well. Based on my experience estimating similar CFO/Finance dashboard builds, here are the additional areas I'd strongly recommend clarifying before finalizing the estimate, as each of them can significantly shift effort:

    1. KPI/Measure complexity — Are the KPIs simple aggregations (sum, average, count) or do they involve time intelligence (YoY, QoQ, MTD/YTD), budget-vs-actual variance, rolling averages, forecasts, or allocations? Complex DAX is often underestimated.

    2. Data volume & historical scope — Row counts, data size, and years of history drive the decision between Import mode, DirectQuery, and Incremental Refresh. This materially affects both build effort and performance tuning.

    3. Row-Level Security (RLS) — Will different CFO team members, regional finance heads, or BU leaders see restricted data (by entity, geography, cost center)? RLS design and testing is a separate line item and often missed at estimation stage.

    4. Design expectations — Does the client have wireframes, brand guidelines, or a Power BI theme, or are we designing from scratch? Custom design with iterative review cycles can add 20–30% to build effort.

    5. Drill-through & interactivity — How many drill-through pages, cross-filter interactions, and detail views are expected? The KPI count alone doesn't capture this.

    6. Data readiness vs. modeling effort — "Data is available" ≠ "data is modeled." Is the source already in a star schema, or will we need significant transformation in Power Query or upstream? Who owns fixing data quality issues if found mid-development?

    7. Deployment & post go-live support — Dev/UAT/Prod workspace setup, deployment pipelines, and whether hypercare/warranty period is expected (and for how long).

    • A few smaller clarifications worth adding:
    • Expected number of report pages (separate from KPI count)
    • Refresh frequency for non-real-time data
    • Alerting/subscription requirements
    • Licensing already in place (Pro, PPU, Premium, Fabric capacity)
    • Target go-live date

    Once these are clarified alongside your original questions, you can break the estimate down cleanly by phase (discovery, data modeling, development, testing, deployment, hypercare) rather than as a single number.

    Hope this helps.
    If you found this helpful, please consider giving it a kudo and marking it as the accepted solution — it goes a long way in helping others facing the same issue.

    For more Power BI tips and discussions, let’s connect on LinkedIn:
    https://www.linkedin.com/in/natarajan-manivasagan

    Cheers!