Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

July 7 - July 17 | Round 2 of the Power BI Dataviz World Championships. Don't miss your chance! Learn more

Reply
kamil2
Frequent Visitor

Different data time zones between R and Power Bi Desktop using the same source code in R

I work with GmailR package and Power Bi and I observe that my email data have different message "time" in RStudio (correct time UTC+1, same that in Gmail account) and Power Bi (wrong time, UTC+0) when I using same query code in both tools.

Screen:
stack_power_R_time_wtf.jpg

link:
https://ibb.co/TM12Bk1

My query code is based on gmailR, i get specific data in list's from gmail and transform to table (tibble object in R). Then I run code in PowerBi as data source.
I get time from message list, not fuction gm_data (because of cases when this function get null values). Below sample code (in R):

 

gmail_DK<- msgs_meta_DK %>% {
tibble(
date = map_chr(., "internalDate")
)

 



and then I change timestamp to normal data time. Sample code (in R):

 

 gmail_DK <- gmail_DK %>%
mutate(date = as.POSIXct(as.numeric(date) /1000, origin="1970-01-01"))

 

 


I checked regional settings in PowerBi Deskop and it is correct - UTC+1.
I'm in UTC+1 time zone, gmail account is for UTC+1 (this is customer service email, but as I know all customer agent's are too in UTC+1 time zone) and most of message are from and to UTC+1 users.

I can change this difference using PowerQuery or just add hour in my query code in R, but I'm curious why is this difference happen?

 

1 REPLY 1
lbendlin
Super User
Super User

It's not really wrong per se, it''s how Power BI is designed.  By default Power BI runs on UTC, and you as the developer can choose to let it do its thing (and let the report consumer's locale do the conversion) or - if you choose - to enforce a particular timezome.

Helpful resources

Announcements
FabCon and SQLCon Barcelona 2026

FabCon & SQLCon – Barcelona 2026

Join us in Barcelona for FabCon and SQLCon, the Fabric, Power BI, SQL, and AI community event. Save €200 with code FABCMTY200.

60 days of Data Days Carousel

Data Days 2026

Join Data Days 2026: 60 days of free live/on-demand sessions, challenges, study groups, and certification opportunities.

Power BI DataViz World Championships carousel

Power BI DataViz World Championships - June 2026

A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.

Top Solution Authors