I'm trying to make bar chart with a running total of costs for each project for a specific date range. Each project Has a start/end date. By selecting a project on a slicer the chart should be adjusted for the specific date range and should display only the costs for this date period.
I want to achieve something like this:
Costs CostsCumulative
February 17 20 20
March 17 30 50
April 17 30 80
Minimum reproduction .pbix files can be found on dropbox:
https://www.dropbox.com/sh/1fyp0hks3p0q4hm/AABNEJBXJconaSA1qv0jtPbHa?dl=0
Solved! Go to Solution.
@kala2 , if these two blog on same topic can help
the formula in this Matrix as Project plan Visual: https://youtu.be/R25QoiyoSVs