Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM. Register now.

Reply
ITactuary
New Member

Complex two-dimension Date solution

Hi - I am new to Power BI and have a complex problem that I am struggling with. I want a timeline graph (cost%revenue) but the denominator (revenue column) keeps on shifting based on date. Adding to the complexity of the problem is that there are 2 datasets and both of them have dates. I want to plot the dates even if there is no data in that date (i tried selecting show even if there is no data but thats not working either). Also, there can be additional conditions (filters, slicers, etc) which I have not shown in the sample data for now. I have shown what I have been able to achieve, but any help on what I want to achieve will be really great.

 

Link to excel file:

https://1drv.ms/u/s!AkqgETP2KnGI8Uw3J1eqi-nllZxs?e=icyZtt 

I also have pasted the PowerBI file in the same link, but can ignore the file. Thanks in advance for your help!

1 ACCEPTED SOLUTION
Greg_Deckler
Community Champion
Community Champion

@ITactuary Maybe something like Open Tickets? 
Take a look at these two Quick Measures as I think you want something like them.

https://community.powerbi.com/t5/Quick-Measures-Gallery/Open-Tickets/m-p/409364
https://community.powerbi.com/t5/Quick-Measures-Gallery/Periodic-Billing/m-p/409365

 

Sorry, having trouble following, can you post sample data as text and expected output?
Not really enough information to go on, please first check if your issue is a common issue listed here: https://community.powerbi.com/t5/Community-Blog/Before-You-Post-Read-This/ba-p/1116882

Also, please see this post regarding How to Get Your Question Answered Quickly: https://community.powerbi.com/t5/Community-Blog/How-to-Get-Your-Question-Answered-Quickly/ba-p/38490

The most important parts are:
1. Sample data as text, use the table tool in the editing bar
2. Expected output from sample data
3. Explanation in words of how to get from 1. to 2.



Follow on LinkedIn
@ me in replies or I'll lose your thread!!!
Instead of a Kudo, please vote for this idea
Become an expert!: Enterprise DNA
External Tools: MSHGQM
YouTube Channel!: Microsoft Hates Greg
Latest book!:
DAX For Humans

DAX is easy, CALCULATE makes DAX hard...

View solution in original post

2 REPLIES 2
Greg_Deckler
Community Champion
Community Champion

@ITactuary Maybe something like Open Tickets? 
Take a look at these two Quick Measures as I think you want something like them.

https://community.powerbi.com/t5/Quick-Measures-Gallery/Open-Tickets/m-p/409364
https://community.powerbi.com/t5/Quick-Measures-Gallery/Periodic-Billing/m-p/409365

 

Sorry, having trouble following, can you post sample data as text and expected output?
Not really enough information to go on, please first check if your issue is a common issue listed here: https://community.powerbi.com/t5/Community-Blog/Before-You-Post-Read-This/ba-p/1116882

Also, please see this post regarding How to Get Your Question Answered Quickly: https://community.powerbi.com/t5/Community-Blog/How-to-Get-Your-Question-Answered-Quickly/ba-p/38490

The most important parts are:
1. Sample data as text, use the table tool in the editing bar
2. Expected output from sample data
3. Explanation in words of how to get from 1. to 2.



Follow on LinkedIn
@ me in replies or I'll lose your thread!!!
Instead of a Kudo, please vote for this idea
Become an expert!: Enterprise DNA
External Tools: MSHGQM
YouTube Channel!: Microsoft Hates Greg
Latest book!:
DAX For Humans

DAX is easy, CALCULATE makes DAX hard...

Hi @Greg_Deckler thanks for pointing me to Generate function. This is similar to what I need - I should be able to tweak this function to my desired solution. Thanks a lot for your help!

Helpful resources

Announcements
Fabric Data Days Carousel

Fabric Data Days

Advance your Data & AI career with 50 days of live learning, contests, hands-on challenges, study groups & certifications and more!

October Power BI Update Carousel

Power BI Monthly Update - October 2025

Check out the October 2025 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.