Hi ,

I have a set of data of machines running in a factory as given below :

Error_Type     Downtime_Duration       Downtime_Started           Downtime_Ended           Machine       Val

Pow_Fail                 23                          5/2/2020 7:35:53 AM      5/2/2020 7:58:55 AM          Mn1            1

Pow_Fail                 28                          5/2/2020 8:00:06 AM      5/2/2020 8:28:55 AM          Mn1            1

Pow_Fail                 28                          5/2/2020 8:30:05 AM      5/2/2020 8:58:56 AM          Mn1            1

Pow_Fail                 23                          5/2/2020 9:00:06 AM      5/2/2020 9:28:56 AM          Mn1            2

 

Downtime Duration is calculated as difference between Downtime_Ended & Downtime_Started .

My requirement is , for each distinct machine & each distinct error type , consider downtime duration only when value in column "Val" has been incremented .

i.e) if Val = 1 for adjucent rows , no error has occured (Rows 2 & 3 need not be considered since no error has occured) , but when Val = 2 , then an error has occured (Duration from row 4 need to be considered ) .

 

Ultimately I need to find total time lost as downtime during a particular Operational Day.

 

Pls Help me .

 

Thanks in Advance..

 

 

 
 

3 Replies

  • Anonymous , try like

    diff last downtime end = datediff(maxx(filter(table, [Downtime_Started]<earlier([Downtime_Started]) && [machine]<earlier([machine])),[Downtime_Ended]),[Downtime_Ended],minute)

    • Anonymous's avatar
      Anonymous
      Not applicable

      Hi Amit ,

       

      Tried your solution but I'm not getting any value . The output seems to be blank.

       

      Swathi

       
       
  • v-yingjl's avatar
    v-yingjl
    Community Support

    Hi Anonymous ,

    You can try this measure if I got it correctly:

    Measure = 
    VAR _startdate =
        SELECTEDVALUE ( 'Table'[Downtime_Started] )
    VAR _val =
        SELECTEDVALUE ( 'Table'[Val] )
    VAR _lastval =
        LOOKUPVALUE (
            'Table'[Val],
            'Table'[Downtime_Started], CALCULATE (
                MAX ( 'Table'[Downtime_Started] ),
                FILTER (
                    ALLEXCEPT ( 'Table', 'Table'[Error_Type], 'Table'[Machine] ),
                    'Table'[Downtime_Started] < _startdate
                )
            )
        )
    VAR _re =
        CALCULATE (
            MAX ( 'Table'[Downtime_Duration] ),
            FILTER (
                ALLEXCEPT ( 'Table', 'Table'[Error_Type], 'Table'[Machine] ),
                'Table'[Val] = _val
                    && 'Table'[Downtime_Started]
                        = CALCULATE (
                            MIN ( 'Table'[Downtime_Started] ),
                            FILTER (
                                ALLEXCEPT ( 'Table', 'Table'[Error_Type], 'Table'[Machine] ),
                                'Table'[Val] = _val
                            )
                        )
            )
        )
    VAR _re2 =
        CALCULATE (
            MAX ( 'Table'[Downtime_Duration] ),
            FILTER (
                ALLEXCEPT ( 'Table', 'Table'[Error_Type], 'Table'[Machine] ),
                'Table'[Val] = _lastval
                    && 'Table'[Downtime_Started]
                        = CALCULATE (
                            MIN ( 'Table'[Downtime_Started] ),
                            FILTER (
                                ALLEXCEPT ( 'Table', 'Table'[Error_Type], 'Table'[Machine] ),
                                'Table'[Val] = _lastval
                            )
                        )
            )
        )
    RETURN
        IF (
            ISBLANK ( _lastval ),
            SELECTEDVALUE ( 'Table'[Downtime_Duration] ),
            IF ( _lastval = _val, _re, _re + _re2 )
        )

    By the way, when val =2, why duration is 23 not 28 if it calculates the datediff..

    Sample file is attached, please check and try it: Calculating Error Duration between 2 dates for Machines.pbix 

     

    Best Regards,
    Yingjie Li

    If this post helps then please consider Accept it as the solution to help the other members find it more quickly.