Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Get Fabric Certified for FREE during Fabric Data Days. Don't miss your chance! Request now

Reply
Anonymous
Not applicable

Axis Start Stop Error

I have a PBI with a line and clustered column chart where all values are negative (only costs are shown). I want to fix the start and stop of the Y-axis , because when I select options in the slicers I want the bar sizes to bring meaning.

I keep getting an error "The number is too high" or the "The number is too low", when I try to fix both start and stop - the error message depends on which field is set first - so currently I can only set one the fields with static values.

It's really strange because I have another chart which is basically the same, however all values are positive (only revenue shown): the start is set to 0 and stop to 90, with no problems at all.

 

Is there a way to fix this?

1 ACCEPTED SOLUTION
Anonymous
Not applicable

I figured it out myself: since all values are negative, the start must be the lowest value and the stop must be the highest value (zero in my case).

View solution in original post

1 REPLY 1
Anonymous
Not applicable

I figured it out myself: since all values are negative, the start must be the lowest value and the stop must be the highest value (zero in my case).

Helpful resources

Announcements
November Power BI Update Carousel

Power BI Monthly Update - November 2025

Check out the November 2025 Power BI update to learn about new features.

Fabric Data Days Carousel

Fabric Data Days

Advance your Data & AI career with 50 days of live learning, contests, hands-on challenges, study groups & certifications and more!

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.

Top Solution Authors