pbris
5 TopicsPBRIS doesn't work in edge on ipad
hi there, after IOS was updated to a version 26.5 we are struggling that pbris can't be opened on the edge. pbris - version 15.0.1121.120 (may 2026), edge - the latest version 152.0.4191.53. The option (allow cross-website tracking is off(also tried on ON side). tried also on safari, chrome browsers - the problem is the same. the problem began with the previous edge option and between the updates it worked, but then the problem appeared again. what else can i try, need your advice.Solved64Views0likes3Commentsthe settings PBRIS application doesnt work
hi there, the problem is on ipad, pbris application. The user tries to set the parameter: PBRIS alternative rendering, make it ON. When user closes the parametres, the settings are getting immediately lost. Version PBRIS: 38.2. IOS 26.5 ( without that option after this update the user cant see any report). we tried hard reset, reinstall the application - nothing helps.65Views0likes3CommentsPower BI Server May 2022 - High memory usage on msmdsrv.exe
Hey all, We had the issues with the Jan release, where the CPU was causing issues, and upgraded to May on the weekend. This morning, I came in and found the memory for msmdsrv.exe using 300+gb of RAM, plus the same in virtual memory, and using everything the server had - not leaving any memory for the database service etc. I know it probably comes down to poor models from my team, but is there any way of limiting the amount of RAM available to the service in the config? There looks to be some guidence from Microsoft on this for Analysis Service, but I want to make sure it's the same guidence for Power BI Report Server, and which settings would be recommended to set.Solved7.7KViews0likes2CommentsChanging developer to evaluation license
I am trying to change the developer edition to the evaluation edition. Nothing is technically in production and all is still development within my internship project. But i would like to have the possibility open to change it to an evaluation when data will be used because from my understanding there are 180 days of evaluation where the PBRIS can be used for production, after that a license needs to be bought. Is this correct? this is currently the scenario, where the next button is grey. ty in advance.Solved1.3KViews0likes1Comment