Forum Discussion
rickymcmaster
2 years agoFrequent Visitor
Swap semantic model in Power BI Service
Hi, I created a report directly in the service based on a semantic model in another workspace, and now I'd like to change the source to a semantic model in the same workspace as the report. However, ...
- 2 years ago
There are any option that I can think of is to use git integration and get. the PBIX file into source control and doing it that way you would get the data set and the report. What you could then do is get the pbip file and open that in Power BI desktop which will allow you to then get the report.
GilbertQ
Super User
2 years ago
The only workaround is to download the reports and then open it up in Power BI desktop and connect it to the new source.
rickymcmaster
2 years agoFrequent Visitor
Thanks GilbertQ , I edited my question to make it a bit clearer. The original report was based on a semantic model in another workspace. When I created it I (obviously) did not realise this was a limitation.