Don't miss your chance to take the Fabric Data Engineer (DP-700) exam on us!
Learn moreWe've captured the moments from FabCon & SQLCon that everyone is talking about, and we are bringing them to the community, live and on-demand. Starts on April 14th. Register now
Each scheduled refresh takes three times as long as on-demand refresh. Is this a bug or a feature?
HI @fbackes,
Based on document, it said that the 'scheduled refresh' not fully accurate refresh, it may have some delay.
When you configure a time for scheduled refresh, there can be a delay of up to one hour before it begins.
Reference link:
Regards,
Xiaoxin Sheng
Reading the question I don't think @fbackes is talking about the time the refresh starts but rather the time the refresh takes to complete from start to finish. I have the same question. When I watch my refresh happening in it takes much much longer to complete than a manual refresh. Any idea why that is?
Hi @Justair07 ,
I'm having the same refresh duration difference between manual refresh and scheduled refresh. Have you figured out why this happened? Thanks!
Lexi
Hi @LexiQiang,
Sorry for the late response. I believe it has to do with using a gateway. When using a gateway I'm speculating that whatever VM is being used has something to do with it. Do you use a gateway?
Hi, I can see this is an old topic and even now the issue is the same. When the refresh is scheduled it takes almost 30m to finish, however when I click the button to refresh it only takes around 2minutes (from the same PBI service webpage).
If I open the report in PowerBI for desktop and refresh the data it takes 2minutes also. I'm not using any gateway, all data source is in Sharepoint.
So did anyone find out why is this happening or what is the workaround?
Thanks in advance.
@fbackes The scheduled refresh time is not the Exact time the refresh will take place. From my understanding the goal is that it kicks off within the hour (usually ~30 minutes) from the scheduled refresh time that was set. This is most likely why it appears to take longer, because it hasn't actually executed.
If you have recently started exploring Fabric, we'd love to hear how it's going. Your feedback can help with product improvements.
A new Power BI DataViz World Championship is coming this June! Don't miss out on submitting your entry.
Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.
| User | Count |
|---|---|
| 29 | |
| 23 | |
| 17 | |
| 15 | |
| 14 |