Scheduled refresh always takes three times as long as on-demand refresh

Each scheduled refresh takes three times as long as on-demand refresh. Is this a bug or a feature?

 

 

6 REPLIES 6
Anonymous
Not applicable

HI @fbackes,

 

Based on document, it said that the 'scheduled refresh' not fully accurate refresh, it may have some delay.

 

Note:

When you configure a time for scheduled refresh, there can be a delay of up to one hour before it begins.

 

Reference link:

Data refresh in Power BI

 

Regards,

Xiaoxin Sheng

Reading the question I don't think @fbackes is talking about the time the refresh starts but rather the time the refresh takes to complete from start to finish. I have the same question. When I watch my refresh happening in it takes much much longer to complete than a manual refresh. Any idea why that is?

Hi @Justair07 ,

 

I'm having the same refresh duration difference between manual refresh and scheduled refresh. Have you figured out why this happened? Thanks!

 

Lexi

Hi @LexiQiang,

 

Sorry for the late response. I believe it has to do with using a gateway. When using a gateway I'm speculating that whatever VM is being used has something to do with it. Do you use a gateway?

Hi, I can see this is an old topic and even now the issue is the same. When the refresh is scheduled it takes almost 30m to finish, however when I click the button to refresh it only takes around 2minutes (from the same PBI service webpage).

 

If I open the report in PowerBI for desktop and refresh the data it takes 2minutes also. I'm not using any gateway, all data source is in Sharepoint.

 

So did anyone find out why is this happening or what is the workaround?

 

Thanks in advance.

Anonymous
Not applicable

@fbackes The scheduled refresh time is not the Exact time the refresh will take place. From my understanding the goal is that it kicks off within the hour (usually ~30 minutes) from the scheduled refresh time that was set. This is most likely why it appears to take longer, because it hasn't actually executed.

Helpful resources

Announcements
Power BI DataViz World Championships

Power BI Dataviz World Championships

Vote for your favorite vizzies from the Power BI World Championship submissions!

Sticker Challenge 2026 Carousel

Join our Community Sticker Challenge 2026

If you love stickers, then you will definitely want to check out our Community Sticker Challenge!

January Power BI Update Carousel

Power BI Monthly Update - January 2026

Check out the January 2026 Power BI update to learn about new features.

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.