Forum Discussion
Power BI with Git. Is Visual Studio code mandatory?
Rui and I looked into our one further and it turned out the culprit is the Power Automate visual. It was originally a custom visual but was brought into Power BI as a standard visual. Something about that has caused a problem. We will need to wait for a fix to be deployed along with a Power BI Desktop update. I haven't tried the latest version, so i'm unsure if the fix is there yet.
Thank you,
I'm not sure if this was the a similar situation. We have several Custom Visuals in the report. I rebuilt the report, using the same visuals, and I am no longer getting the error when synching the workspace to ADO repo. There was only one visual that I needed to add, but it did not create the same CustomVisuals folder in the .report directory. It might be that the rest of the visuals are now standard.