Forum Discussion
Power BI Workspace git integration
- 1 year ago
It's not a mistake.
Power BI implementation planning: Integration with Other Services - Power BI | Microsoft Learn
If your workspace uses Fabric capacity, Premium capacity, or PPU license modes, you can use Git integration to connect a workspace to a remote Git repository to support more advanced lifecycle management scenarios.
It sounds like your workspace is already assigned to a Git-enabled workspace connection, but it’s not letting you disconnect or view the Git option anymore.
Could you please check the following:
-
The workspace was previously connected to a Git repository and was later converted to a non-Git-enabled state for example, if the Premium license changed or settings were reverted.
-
There are residual Git metadata bindings that weren’t properly cleared.
There are few suggestions which i would like to raise :
-
Check if your workspace is still in a Premium or Fabric capacity Git integration only works with those.
-
Go to the deployment pipeline settings (if used) and see if any source control options are still referenced.