Forum Discussion
Sidhant
Advocate V
9 months agoPower BI Project file (*.pbip) to Power BI File (*.pbix)
Hi everyone, So I have agentic setup in place wherein through a given MetaData file (of a source: like Tableau) which has the requitred set of information I generate a Power BI Project file (*.pbip)...
nandic
Resident Rockstar
9 months agoSidhant , the logic is to use pbip files and to store them (publish them) to Azure Devops branch.
And then you connect your Power BI workspace to Azure Devops branch.
Summary: you keep pbip files, no need to convert them to pbix files, and these files are in sync with Power BI workspace.
Useful links:
Microsoft: Link
Youtube links on this topic: Link
Cheers,
Nemanja
Sidhant
Advocate V
9 months agoHi nandic ,
Thanks for the response I will check that out. So I just wanted to understand in my current context the (end-user centric) wherein the user clicks execute and then the respective report has to be published and when they log in the respective workspace they see the respective reports will this be viable option?
Regards,
Sidhant.