My workspace contains over 80 objects (report and dataset only), i am not sure if it hits the limits or the git sync operation timeout
It might be hitting the commit size limits, but you should get a better error in this case.
were you able to commit all your 80 objects manually in a single commit?
- lapres3 years agoHelper I
No, I got the error when I initially connected the workspace to git repos. Then, all 80 objects become uncommitted status and show in the list. I have to sync in the batch of 5 items at a time.
However, even I can commit all objects into the repos. The source control status still takes ages to load.
- Nimrod_Shalit3 years agoPower BI Team
So, is now everything OK? is the problem that it takes a lot of time to load, or something is still not working?
Are you eventually able to work with the workspace and git?
- lapres3 years agoHelper I
Not really, the source control status never comes back. Even if it comes back with the uncommitted figure, the list can be empty.