Forum Discussion
Need to have Do Not Summarize on Values
- 9 years ago
I attended a Power BI workshop seminar here in town last week, and was able to discover the solution of setting the default summarization to Don't summarize.
So, that seems to be resolve my problem.
Thanks for your time and help.
This does not resolve the problem in my case. I am pulling project data from MS Project. I pull the "percent work completed" field. It's default is a decimal number. Whether I have the default of "Do not Summarize" checked, or whether I change this field to a percentage or a whole number, it does not give me the option to "do not summarize"
See below for a video
https://www.dropbox.com/s/mx67w108o7573ur/2019-01-28%2015-24-36.flv?dl=0
Hi Eric,
I am facing the same issue with a numeric column and can't see "Don't summerize" option.