Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
I have uploaded some PBIX files in the Report server with local host connection strings (SQL Server and Analysis Services). After the upload, when i enter the Manage option and try to edit the connection string, it is in grey out condition and cannot be edited. I need to edit it and give my production configurations.
Kindly help.
Thanks,
Sabari
Solved! Go to Solution.
I took the Power BI desktop file in production region, changed the data source re-build the report. After builidng and deploying in report server, the connection string looks fine.
I took the Power BI desktop file in production region, changed the data source re-build the report. After builidng and deploying in report server, the connection string looks fine.
Hi @amitchandak
The link which you sent seems to have different issue. My issues happens when i upload the Power BI desktop files in the report server.
Hi, this is issue resolved? Do you know how to make Data sources option work in the report server ?
Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes!
Check out the September 2025 Power BI update to learn about new features.
User | Count |
---|---|
12 | |
3 | |
3 | |
3 | |
2 |