I have an enterprise gateway setup on a seperate server with a mysql database used for a report in power bi online. I can manually refresh the dataset but when I schedule a refresh, the refresh never runs and I receive no email notification regarding a failure.
The gateway status is online and the service is running on the server with the mysql database.
The user has been setup for the datasource in the gateway and the connection is successful when tested.
Anyone have any ideas as to why?
UPDATE: The first scheduled refresh just ran... I scheduled it for 9:00am and it ran at 9:14am?? The user was changed to be able to manage the enterprise the gateway around this time. Is that necessary to be able to schedule refreshes?
@langer83 it is said officially that when you setup schedule refresh it may take upto 1 hour for it to trigger. having said that i have always seen schedule refresh starting in 15 mins time frame of the actual schedule.
The scheduled refresh started working now but is about 2 hrs+ late. The last 3 refreshes were scheduled for 11:30am.
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.
Check out the June 2025 Power BI update to learn about new features.
User | Count |
---|---|
13 | |
13 | |
10 | |
8 | |
7 |
User | Count |
---|---|
17 | |
10 | |
7 | |
6 | |
6 |