Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now! Learn more
I have pulled in three different objects from Salesforce. The file is 149,335KB. As I start to build a basic table, I get an error that says, "Couldn't load the data for this visual: There's not enough memory to complete this operation. Please try again later when there may be more memory available." I have tested loading the file on both an 8GB and 16GB computer, both have failed.
Has anyone else experienced this? What recommendations do you have?
Thanks in advance!
Do you use 32 bit or 64 bit Power BI Desktop? How do you build the basic table in Power BI Desktop? Do you take merge/append operations in Query Editor?
Regards,
Lydia
Hi Lydia @Anonymous,
I have the 64 bit Power BI Desktop installed. I just started adding fields to a basic table in Power BI. The more fields I added, the more it slowed down and then crashed.
@LeanneShapro,
How many rows in your table and how many fields you add to the table visual when the error throws?
Regards,
Lydia
The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now!