Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now! Learn more
Hello team
i am having problems to sincronze some dataset (powerbi portal) with my server (gateway connector)
the system send me this message :
-------------------------------------------------------------------------------------------------------
Refresh failed:
PBI_RODRIGO_FIGUEROA has failed to refresh.
Failure details: The last refresh attempt failed because of an internal service error. This is usually a transient issue. If you try again later and still see this message, contact support.
{"error":{"code":"DM_GWPipeline_Gateway_GatewayOverloadedConcurrency","pbi.error":{"code":"DM_GWPipeline_Gateway_GatewayOverloadedConcurrency","parameters":{},"details":[],"exceptionCulprit":1}}} Table: BI BI_CALENDARIO.
Next refresh for PBI_RODRIGO_FIGUEROA is scheduled for May 12, 2023 17:00 UTC.
-------------------------------------------------------------------------------------------------------
Any know i can resolve this ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.