lysdexia
3 years agoRegular Visitor
Status:
Needs Info
Power BI Source Control Does not Allow One to Check out the main Branch
I recently added source control to a Power BI workspace. I was able create a new branch (which is called "Checkout new branch"), make changes to a report, and commit the changes. I was able to s...
rc449
2 years agoNew Member
Hello Team,
I am facing this same issue with switching between branches.
I think an admin may be able to switch between branches by going to workspace settings => Git Integration.
I think any uses who have access to edit reports should have access to switch between branches.
I hope microsoft will fix this issue.
Thanks,