Forum Discussion
Error Syncing Notebooks from Microsoft Fabric UI to VS Code
Hi SergioTorrinha,
I'd like to suggest you take a look at the following document about block self-service usage if it suitable to your scenarios:
About self-service sign-ups and purchases - Power BI | Microsoft Learn
BTW, you can also check if they enabled the device protect about azure account usages:
Regards,
Xiaoxin Sheng
Hi Anonymous,
Thanks for the input!
I will definitly check this interanally.
- Anonymous1 year agoNot applicable
Hi SergioTorrinha ,
Any update on this? Did the above suggestions help with your scenario?
Regards,
Xiaoxin Sheng
- SergioTorrinha1 year ago
Resolver II
Hi Anonymous !
Not yet. I will get back to you on this whenever I have soemthign to share.
Thank you. - SergioTorrinha1 year ago
Resolver II
Hi Anonymous !
After checking internally, it turns out that my MS Fabric admin is not allowing us (blocking us) to use PBI, hence, I beleive, the dificculty on connecting PBI desktop to my semantic model residing in MS Fabric. However, it is unclear for me at this point, if this 'block' scenario is also affecting VS code.With the above in mind, I would like your help to understand a bit better the issue I'm currently facing. For starters, can you be so kind and specifically answer on each of my two questions bellow, please?
1. Regarding VS Code authentication, is there any admin portal setting that blocks autenticating to MS Fabric via VS Code? In affirmative case, which setting is it? I would like to specifically indicate this setting, so my admin don't waste time looking for it and we can move forwards with our developments without any constraint. Furthermore, I have been reading the documentation about VS code integration and I found no evidence that VS code can be blocked, so this question is simply to ensure I'm not wrong on this.
2. I understand that the usage of PBI service is blocked by my MS Fabric admin. However, is it possible to connect via PBI desktop to my semantic model without using the PBI service for now? Is there any admin setting that should be unlocked to be able to do this?
My project is in a PoC stage and I would like to use PBI in future analysis related work, so making a PoC in PBI desktop would be a way to add value on that regard.
Looking forward for your clarifications.
Thank you.