To make two visuals scroll in SYNC based on common shared axis.
22 Comments
- arunsivakumarNew Memberit is required by my colleague
- GreeneRNew MemberIf this could be implemented I would use it to scroll a data table and a project gantt chart simultaneously.
- vitor_matosNew MemberYes, that would be great for Gantt charts. I have the same need, since we can't show milestone dates on the Microsoft Gantt visual.
- David_Swann1New MemberThis is a basic in Qlik
- katie_birkwoodNew MemberThis would be very helpful. I really hope this is introduced into PBI soon.
- V-DVAIDYANew Member
I have a requirement where i need to show dynamic Rankings for the measure by which the grid is sorted at that moment.
Having a slicer for measure name list and showing ranking with selected value is one alternative but comes little complex for user. We are trying to add a static rank grid having only one column and making it scroll synced with the main grid which has all the measures. Such that this rank grid will be close to the measure grid and scroll together
- fbcideas_migusrNew Member
Option to SYNC scroll bar for required objects will good.
- rana_khanNew Member
This functionality required, as it is basic functionality in Qlik
- Pippa_DickinsonNew Member
I have two tables that I need to scroll in sync. So easy in excel, yet impossible in PowerBI! Without this, I am struggling to meet the clients requirements, and fear that they will chose to stick with using excel over thePowerBI dashboards.
- tweiNew Member
this helps expand a lot of visual capabilities ;x
Recent ideas
Accessibility issue in the Share dialog of embedded Power BI reports
Accessibility issue in the Share dialog of embedded Power BI reports I would like to share an accessibility finding identified while testing an embedded Power BI report published as part of the cont...ugartema2 hours agoNew MemberNew8Views1like0CommentsAbility to Isolate Fabric Workspaces Across Browser Tabs and Windows - Power Bi Service
When opening a Fabric workspace in a new browser tab, I cant keep different workspaces open across multiple tabs. The workspace context appears to be shared between tabs. For example: Tab 1 = Dev...aashraysood3 hours agoMicrosoft EmployeeNew108Views9likes2CommentsEventhouse Event Hub Ingestion: Respect retrieval start date during preview sampling
In the Eventhouse / KQL Database "Get Data" (One-Click) ingestion wizard for Azure Event Hubs, the preview/inspection engine samples messages starting from the oldest retained events in the partition...dskiftesvik4 hours agoNew MemberNew4Views0likes0CommentsSupport VNet data gateway connections in Power BI Report Builder (Get data / Power Query)
Power BI Report Builder can't use a VNet data gateway connection. In Get data (Power Query), the Data gateway field shows "none" and can't be changed, so the query goes straight to the source over th...ilia_ryzhkov10 hours agoNew MemberNew21Views2likes0CommentsOption to set custom width for gridlines OR fixed outer padding
When designing reports, using the align and distribute evenly options in the format pane are useful, however when designing report pages with fixed bleeds between visuals I have to follow these steps...IolaWhiteley19 hours agoAdvocate IINew9Views0likes0Comments