If I have created a dashboard based on a specific dataset and connection, can I keep the same type of visualization but switch the dataset and the connection to another table? Basically I need to change the table to a different one, but I do not want to change the visualization on the dashboard.
4 Comments
- geetika_leekhaNew MemberHi! Have you figured this out? I am struggling with the same. I have the same data format in multiple excel sheet for multiple years, want to create a single dashboard that i can use for the multiple years.
- david_lean1New MemberWe need this to support standard release management. The PowerBi developer may need to prototype much of the system in UAT against Masked Data. Then make it live against a production system where they no longer have permission to see the data. This is especially the case where only the customer can see their own personal data. We'd lose business if they thought our IT staff could spy on them.
- v-brjudgNew MemberExisting visualizations for a published content pack broke for consumers when the data source changed in the source file, even though the visualizations worked in the group workspace. Is this a known issue? The solution was to rename the components of the content pack (data set, report and dashboard) in the workspace, re-add the .pbix to the workspace with the original name, then update the content pack to read from the "new" components.
- fbcideas_migusrNew MemberStatus added:Needs Votes
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v16 hours agoCommunity ChampionNew617Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v23 hours agoCommunity ChampionNew20Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401971 day agoFrequent VisitorNew6Views0likes0Comments