Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

View all the Fabric Data Days sessions on demand. View schedule

Remove Table List from Pipeline Task for Semantic Model Refresh

If I MANUALLY refresh a Semantic Model from the user interface, I do NOT need to specify which tables to refresh. So WHY do I need to do so in the settings of a Pipeline Task that does the same thing. 

 

This thing is broken. If I remove a table from my Semantic Model, this task fails because it still has that table listed. Plus when I go back in to the task to edit it, I need to re-select the Workspace and Semantic Model. Like it doesn't remember those settings.

Status: New
Comments
ToddChitt
Super User
Suggestion: Make this task look similar to this mock-up shown in this forum thread: https://community.fabric.microsoft.com/t5/Data-Engineering/Semantic-Model-Refresh-pipeline-task-show... To describe it: Move the Tables selection control to an area with "Optional" as the header. That communicates to the user that one does not need to specify individual tables to get it to work.