Power BI designer should integrate Power Map design experience, don't let Power Map just like a stand-along part of Power BI...
35 Comments
- nishalitNew MemberWe are looking to improve our maps. A new Shape Map control is expected in the summer which will solve some of these issues.
- gerard_basNew MemberIt should be also a great idea to integrate Power Map into Power BI Preview dashboards.
- breydenNew MemberI wish i could use all my votes on this idea. Power Map is a great product and it would be sad to see if it remains as a stand alone part of Power BI. Just imagin how amazing it would look for the CEO to not only drill down into data but visually see this data over time, and see areas of opertunity not only from graphs but from Power Map
- tvermontNew MemberThis feature would greatly improve the value of the Power BI stack
- ChathurangaAb1New MemberThis is something we are waiting for, the ability to upload a interactive power Map to Dash board, in case this take some time try to make possible to upload power Map video to Power View canvas or dashboard link
- CHMITCHNew MemberYes. Power map has some great features that are missing from power view. In particular: 1. The ability to aggregate point data (latitude / longitude) at a region level (postal code). 2. Treat point data on a map as a heat map instead of a point. It would be great to get these two features in 2d maps in power view.
- patrick_creamerNew MemberThe ability to add layers to the map is all crucial.
- brian_labrom1New MemberIntegrating PowerMap would make PowerBI a much more compelling offering. It has some great functionality that should sit within this stack
- straitmNew MemberI would love to develop the 3 Dimensional PowerMaps in Power BI. Can we get this added?
- kevin-bejo
Advocate I
For an international organisation a Power Map is the way to go. I wish the Maps in BI would offer at least drill down features, or to be able to add some more data to the bubble (such as % increase measure AND the underlying sales figure). Giving this 3 votes because everybody loves the maps.
Recent ideas
Metadata-Driven Copy Job Control at Table and Column Level
We currently achieve metadata-driven table and column selection in Copy Data activities by using dynamic queries. This allows us to dynamically determine which tables and columns should be processed ...Motasim094 hours agoNew MemberNew6Views0likes0CommentsDynamic ForEach Parallel Batch Count Based on Runtime Capacity
We would like Microsoft Fabric Data Factory to support dynamic configuration of the ForEach activity's parallel batch count at runtime. Currently, the ForEach batchCount is effectively configured as...Motasim094 hours agoNew MemberNew4Views0likes0CommentsMake Workspace-Level Surge Protection Limit Visible to Workspace Users
Please make the applicable workspace-level surge protection limit visible in the workspace settings. Currently, when surge protection is applied by Capacity Admins, workspace users don't get visibil...frithjof_v6 hours agoCommunity ChampionNew27Views2likes0CommentsAllow Custom Recipient Settings for Gateway Expiry Notifications
Now, during the final 90 days before the gateway version end-of-support date, operations continue, but semantic model contacts users can receive warnings in email The warning message is: "The on-prem...YuanMao7 hours agoNew MemberNew8Views1like0Comments