Enable an engine built in formula to calculate Excel equivalent of networking days: Number of business days between 2 dates, excluding weekends and bank holidays provided as an optional list of dates. Currently only complex solutions using other DAX / Query formulas can be used , this solution is very slow and memory intense when applied across many rows and Country holidays table in a multi country regions .
24 Comments
- kdejongeMicrosoft EmployeeHi Conrad, We don't have this on the immediate backlog but it is pretty straightforward to do in DAX. This should do the trick if you want to filter out Saturday and Sunday: Measure = CALCULATE(COUNTROWS('Calendar'), FILTER('Calendar', WEEKDAY('Calendar'[Date]) > 1 && WEEKDAY('Calendar'[Date]) < 7 )) There are even easier ways to do this using a calculated column or Power Query where you add a column to check if a date is a working day. This will simplify the DAX above.
- amarneh_yousefNew MemberHi, The proposed solution by the admin is working if we have only one data, but if we are talking about 2 dates (start date and end date) and we need measure the working days between both dates this solution will not work
- raymond_kilgar1New MemberYes agree I have been able to use a date calendar and holidays and sum working days but is very complex for what should be fundamental capability and simple function, still can't do it natively in SharePoint online! https://community.powerbi.com/t5/Desktop/Number-of-working-days/td-p/22842
- flera_latnikNew MemberAside from being really useful (so should have been added by now?), why are there functions in Excel that are not in Power BI?
- gdeckler4New MemberI added this to the Quick Measure Gallery here: https://community.powerbi.com/t5/Quick-Measures-Gallery/Net-Work-Days/m-p/367362
- cody3New MemberIt's not a hard issue to work around, but something that shouldn't require a work around. All current solutions rely on non-standard holiday table locations. If there was a Microsoft provided standard solution, there'd be a universal method we'd be able to use to reproduce this fairly basic functionality. There's data still living in Excel that I'm reluctant to move for this specific reason.
- julian_bugejaNew MemberI agree after LOTS os searching this post helped me to get a function which is similar. https://community.powerbi.com/t5/Desktop/Network-days-with-decimals/td-p/405476
- nishant_burdhanNew MemberBut it doesnot work if one of the date is blank or nulldate. is there anyway we can calculate the days between two dates column when some of the value is blank.
- Andy-JB_ChenNew MemberThe proposed method does work in calculated column. And should consider it as fundamental functions. Thanks!
- Andy-JB_ChenNew MemberSorry, does NOT work in calculated column
Recent ideas
Semantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v4 hours agoCommunity ChampionNew10Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401977 hours agoFrequent VisitorNew5Views0likes0CommentsAbout "Download SQL database project" and fix the downloaded project
1. The sqlproj must be fixed, it is downloaded without the xml markup line <?xml version="1.0" encoding="utf-8"> 2. The sdk must be updated: Actual: <Sdk Name="Microsoft.Build.Sql" Version="0.1...Jarrinf17 hours agoFrequent VisitorNew48Views3likes2Comments