After Creating Power BI Deployment Pipeline, in future if we want to add a new workspace to the pipeline, we dont have ability.
Looks like we need to delete the whole deployment pipeline and recreate to add one more state.
It would be nice to have this functionality
5 Comments
- lmatthiasNew Member
This is a much needed feature.
- fbcideas_migusrNew MemberStatus added:Needs Votes
- dzebrowitzAdvocate IIf a deployment pipeline is built with 2 stages for instance and we need to add a third stage/workspace to the deployment pipeline, that is currently not possible. We shouldn't need to delete and recreate the deployment pipeline from scratch.
- MaryanneBSAFrequent VisitorI discovered this the hard way. After configuring a deployment pipeline to promote from development to test, including deployment rules for multiple semantic models, to find it is not then possible to add a production environment to this existing pipeline. The only resolution currently is to delete the existing pipeline and all it's deployment rules, to then create a new pipeline with the additional environment and reconfigure all of the deployment rules again from memory (as you can't reference a deleted deployment pipeline and can't add the new one before deleting the old one). The consideration of creating all deployment pipelines with the maximum of 10 stages as a default position, allowing editing of workspace assignment at later date, has crossed my mind - but would only help if the stage is added to the end of the process. When using workspaces containing multiple lakehouses and semantic models, at best this requires very specific documentation of repointing per model and per stage, along with a ton of manual rework should a stage need to be added at the end or in the middle of the process (eg Training environment).
- tom_vanleijsenAdvocate IAbsolutely a must have for deployment pipelines. In our organization we introduce new regions regularly for our customers to use our reporting solution and it would be nice if this can be achieved without re-creating a deployment pipeline. As a workaround we now created a deployment pipeline with as many stages as possible. But not an ideal situation.
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v12 hours agoCommunity ChampionNew615Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v19 hours agoCommunity ChampionNew17Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal14019723 hours agoFrequent VisitorNew6Views0likes0Comments