Integration of Power BI with "R" Now a days "R" become very powerful language for data analysis. Greater dis-advantage with "R" is not so powerful in Data Visualization. So Power BI will act as complementary with "R" if we do tight integration between two (R - Machine Learning and Power BI is Visualizing the result). This is how to utilize power of "R" in Power BI Desktop. Thought of following ways • Run "R" script on top of data which we have in Power BI and Store result back into Power BI (Power BI plays role of data integration with various end points) • Store result of "R" script back into Power BI for better visualization - Reports, Dashboards
4 Comments
- mlecart1New MemberIt would be very helpful !
- andrew_kennedy1New MemberIt would definitely be helpful to run an R analysis on data already loaded into Power BI, then output the results to visualise in the standard Power BI visualisations with their built-in interactivity
- fbcideas_migusrNew MemberYou already have this ability to do this in the query editor using the "Run R Script" in the Transform ribbon.
- fbcideas_migusrNew MemberStatus added:Under Review
Recent ideas
Access Variable Library in Semantic Models
Enable the Variable Library as a centralized location for storing all environment‑specific variables, allowing us to adjust them for promotion scenarios (e.g., from dev to prod) without relying on de...FreddyH8 hours agoAdvocate IINew920Views31likes2CommentsEnhance Fabric Pipeline Monitoring with Parent-Child Pipeline Lineage and Parameter Visibility
Currently, Microsoft Fabric Pipeline monitoring lacks several capabilities that are available in Azure Data Factory, making troubleshooting and operational support challenging in enterprise environme...dwramreddy9 hours agoRegular VisitorNew8Views0likes0CommentsDynamic ADLS-Gen2 path input for Spark Jobs Main definition file
I would like the ability to add a dynamic input box on a spark job definition's "Main Definition File" "ADLS-Gen2 path". this would be useful to set base and variable paths across all spark jobs...mfink_db13 hours agoNew MemberNew238Views2likes2CommentsReintroduce Tenant/Capacity Switch to Control "Users can create Plan items" Post-GA
During the Preview phase of Fabric Plan items, administrators had access to a dedicated tenant/capacity setting: "Users can create Plan items". With General Availability (GA), this granular administr...Sri-Surendra_Ku16 hours agoNew MemberNew106Views14likes1Comment