The ability to change the format of a date similar to in Excel where you can base it on a YYYY, MM, DD, etc.
13 Comments
- angelique_grondNew MemberIt will be very helpfull !!!
- dennis_finkeNew MemberCreate a new column and enter this formula AuditDate2 = FORMAT([AuditDate], "MM-YYYY")
AnonymousNot applicableI need to format datetime values on the x-axis of a line chart as yyyy-mm-dd hh:mm- vaas_conradie1New MemberDates are always displayed in reports as e.g. Monday, 1 January 2016. How do I display it as 1/1/2016?
- seanmcne1New MemberWill, this is a great option - but can we specify our own? For instance, I have a need to display MMM or MMMM (just the month name. The designer appears to "know better" and only lets me pick from a pre-defined list of options.
- peter314159New MemberI agree, custom Date formatting would be incredibly useful. Dennis's solution above (using a calculated column) should work, but since the new column is treated as text instead of as a date, it shows up alphabetically instead of chronologically.
- javid_khanNew MemberI want to format DateTime to Date and it works fine but it trims the Zero. or does not keep zero in the front of single month value(01,02,etc). So when converted and sorted, it displayed like text. 2015/1, 2015/10,2015/11, 2015/12, 2/2015/2, 2015/3 and so on.
- chris95New MemberThis is marked as completed, but I don't see the feature in PowerBI Desktop (I have the latest). I can only format dates from a selection list.
- asriniva33Frequent VisitorHi, I have a basic doubt on working in "Direct Query mode". Would the formatting changes i make in my Power BI Desktop in direct query mode influence the data storage in the underlying database or its just these formatting changes are local to my PC or pbix file. Regards, Srinivas
- poojau229New MemberIs it possible to set the dateformat for the date that we have already entered???
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v20 hours agoCommunity ChampionNew618Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v1 day agoCommunity ChampionNew21Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401971 day agoFrequent VisitorNew6Views0likes0Comments