Ability to let "favorite" groups/workspaces be shown in the top of the groups list
10 Comments
- SteveNovoselacTNew Memberthis is badly needed, especially if you use Power BI a lot as an end user and have a ton of workspaces/groups
- fbcideas_migusrNew Membereven with new navigation preview, we are missing the favorite group. We should able to order the workspace list in the way we wanted instead of just having alphabetical list.
- ShaneNZNew MemberHow is this still not a thing? I would have given up on MS Team by now if it hadn't had this feature, really surprised Power BI does not do anything similar for it's Workspaces.
- fbcideas_migusrNew MemberThe need for this wouldn't be so bad if the frequently used items would persist, but they really don't. I'd love a way to favorite the top 4-5 workspaces I'm in all the time so I don't constantly have to open the workspace list.
- mpedro220New MemberChiming in to voice my support for this idea. My Workspace list is cluttered by "useless workspaces" (i.e. empty workspaces that were created by another team or a Microsoft program itself) and it needlessly takes time to navigate through that list each time I want to go to one of my frequently used Workspaces.
- s_igguldenNew MemberI am a member of about 30 workspaces... I didn't choose to be in most of them - they just got assigned to me because of my role. But the reality is that I flip between just three of these (several times every day) and have to scroll the list every time. Favorites exist with other stuff, why not for workspaces too?
- nick_shenefieldNew MemberThis is needed badly, as a developer of reports for many different groups I have SO MANY workspaces and would love to favorite them. As I only use the same few every day.
- john_barrettNew Member
seems such an obvious good idea
- Jamil_AhmedNew Member
Bump
- fbcideas_migusrNew MemberStatus added:Needs Votes
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v19 hours agoCommunity ChampionNew618Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v1 day agoCommunity ChampionNew21Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401971 day agoFrequent VisitorNew6Views0likes0Comments