I am new to power Bi, I was working on the sample application to Embed Power Bi reports to App. I tried changing the base uri in the sample to get reports designed by us i.e from https://api.powerbi.com/beta/myorg/ to https://msit.powerbi.com/groups/ when I tried doing that I ran into an error saying there was a problem in signing in. Can you please suggest on how to do this or if I am doing something wrong.
1 Comment
- fbcideas_migusrNew MemberStatus added:Completed
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v22 hours agoCommunity ChampionNew618Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v1 day agoCommunity ChampionNew21Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401971 day agoFrequent VisitorNew6Views0likes0Comments