Jimesia_Mason
5 years agoNew Member
Status:
Needs Votes
Dynamically determine default dates when using date slicer with the between option.
Need to be able to dynamically determine between dates slicer similar to the relative slicer, but still with the options to change dates as needed. For example: date slicer should always show the last 30 days. but still have the ability to change start and end dates.
3 Comments
- lspectorNew MemberI am trying to get the most recent 13 calendar months to default in a slicer. For example, if today is 1/7/2022, I would like to default the slicers from 1/1/2021 - 1/7/2022. For many businesses, it is important to see the current month as well as the same month prior year. Is this something MS can add? It's easy to create a dax calendar that has this date range, but there is no option to create a default slicer.
- virakone_sonethNew Member
I wish I could vote for this over and over.
There are so many attempts at working around just being able to set a default range on the between date slicer.
There is a definite and popular user need for a dynamic default range for the between slicer, since users may be required to select custom ranges more specific than what is available in the relative dates.
If I choose a between date slicer it will only stick as the date range I publish with on the report. It would be great to have the benefits of the relative slicer in the range slicer all-in-one, it should not be an either or choice.
Page filters do not work here either, as there can be discrepancy between the visual itself and the page filtered dates leading to a poor user experience.
- fbcideas_migusrNew MemberStatus added:Needs Votes
Recent ideas
Semantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v4 hours agoCommunity ChampionNew10Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401978 hours agoFrequent VisitorNew5Views0likes0CommentsAbout "Download SQL database project" and fix the downloaded project
1. The sqlproj must be fixed, it is downloaded without the xml markup line <?xml version="1.0" encoding="utf-8"> 2. The sdk must be updated: Actual: <Sdk Name="Microsoft.Build.Sql" Version="0.1...Jarrinf18 hours agoFrequent VisitorNew48Views3likes2Comments