When creating a line chart using a TOTALYTD measure—where the x-axis shows months and the legend shows years—it can sometimes result in the line for the most recent year rising until the last actual value, and then continuing flat for future dates.
It would be great to have a feature that allows the future portion of the line to be shown as a dashed line.
If there were a calendar table with a flag to distinguish current and future dates, it could be used to split the line visually. However, since those segments would be treated as separate series, the legend would show them as disconnected.
One workaround might be to duplicate the data for the transition month so both flags have values and the lines connect. But that could introduce a many-to-many relationship, which is best avoided.
So ideally, there would be a way to visually connect the current and future lines for the latest year, without creating a many-to-many relationship, and still allow solid lines for current dates and dashed lines for future dates.
Recent ideas
Power BI report opens in the workspace but not in the Power BI App after .pbip + AI edits
Hello Fabric Community members, I ran into an unusual issue today and wanted to share it in case it saves someone else time. The issue: -> I developed a report in Power BI Desktop and published ...Lodha_Jaydeep1 hour agoSolution SageNew7Views0likes0CommentsEnable Multi‑Select and Bulk Delete in Microsoft Fabric Recycle Bin
Summary The recently introduced Recycle Bin in Microsoft Fabric is a very useful addition; however, it currently lacks support for multi‑select and bulk delete operations. Although the UI displays ...dwramreddy2 hours agoRegular VisitorNew152Views4likes2CommentsDeployment pipeline: Deployment rules for Direct Lake on OneLake semantic models
Currently, it is not possible to use deployment rules with Direct Lake on OneLake semantic models. The option is greyed out. Please enable this, so we can automatically change the data so...frithjof_v4 hours agoCommunity ChampionNew6.2KViews144likes18CommentsOffice 365 Outlook Activity - Add Attachment (Pipelines)
I realize this is still in preview, but I would love to see the ability to add an attachment to an email within a pipeline using the outlook activity. Simple enough I would think, and perhaps it ...JenAbe7 hours agoAdvocate INew631Views6likes1CommentProvide Exactly-Once Triggering for OneLake File Events
Currently, a single completed OneLake file can generate duplicate events and trigger the downstream Fabric pipeline multiple times. Filtering on data.api = FlushWithClose helps identify completed fi...mahadev937 hours agoNew MemberNew7Views0likes1Comment