As an Egagement Manager within Microsoft Consulting Services, it would help me a lot if I could use PowerBi with the tools our consultants use to book their hours (Chronos as a front-end, ChangePoint as backend). I have tried to get in contact with either the owner of the application or the BI group within services who are in charge for reporting. However, they stick with their existing excel-sheets (called JADE) which is too slow and very bad on UX.
1 Comment
- fbcideas_migusrNew MemberStatus added:New
Recent ideas
Semantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v3 hours agoCommunity ChampionNew10Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401977 hours agoFrequent VisitorNew5Views0likes0CommentsAbout "Download SQL database project" and fix the downloaded project
1. The sqlproj must be fixed, it is downloaded without the xml markup line <?xml version="1.0" encoding="utf-8"> 2. The sdk must be updated: Actual: <Sdk Name="Microsoft.Build.Sql" Version="0.1...Jarrinf17 hours agoFrequent VisitorNew48Views3likes2Comments