Hi, I cannot connect to Power BI through the "Microsoft Power BI" Android application version 2.2.160802.111085 (2 august 2016). I previously succeeded in connecting to PBI on Android app in June 2016 but it is unfortunatelly no more possible since July 2016. My Android phone is a Wiko Highway Pure (build WIKO HIGHWAY PURE L Version 8) running an Android verrsion 5.0.2 operating system. Best Regards, SOS-MS.
4 Comments
- AssafMicrosoft EmployeeGood to hear that. Thanks, Assaf
- AssafMicrosoft EmployeeHi, What's the status with the latest version from the Play Store? Did you tried to uninstall the application and install it again? Thanks, Assaf
- sos-microsoftNew MemberHi Assaf, Thanks for jour feedback. It's now working (using PowerBI Android version 111205). Best Regards, SOS-MS.
- fbcideas_migusrNew MemberStatus added:New
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v32 minutes agoCommunity ChampionNew606Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v8 hours agoCommunity ChampionNew12Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal14019711 hours agoFrequent VisitorNew6Views0likes0Comments