Please add MS Project MPP files as a data source. Wonderful things can be done with Project Online and Power BI. I would love to do the same with the MS Project MPP files on my laptop
146 Comments
- bishanruder1New MemberGreat idea to have Power BI read Project .mpp files for reporting creation and visualizations.
- renatolmbNew MemberGreat idea, this functionality would be very important.
- fabio13New MemberWe need this very important resource, too!!!
- v_3New MemberThis would be a very useful functionality
- arun_mNew MemberThis would be really a good option.
- GerhardKrugerNew MemberYes please
- makuhrmanNew MemberNeed an easy way to connect an instance of Project Server 2013 (not online) to Power BI
- pedro_moralesNew MemberYes, It´s very necesary the conexión to ,mpp files.
- jon_rachiele2New MemberPlease, yes.
- madan_kumarNew MemberI have difficulty doing a report through Project Online file connected to Power BI, Better please enable to Power BI connecting .Mpp files
Recent ideas
Variable Library: Disable default value set.
The Default Value Set in the Variable Library poses a risk. The Default Value Set will silently apply values when no explicit value set has been selected for a Test or Prod workspace. There i...frithjof_v2 hours agoCommunity ChampionNew630Views17likes2CommentsScheduled Refresh for Fabric Mirroring
Current Challenge: Fabric Mirroring runs continuously, leading to unnecessary data replication and higher Snowflake costs. There is no built-in option to schedule mirroring based on specific times o...ram_eternal1894 hours agoRegular VisitorNeeds Votes472Views3likes2CommentsMake workspace and item session persistence optional
Description The new persistent session behavior in Microsoft Fabric should be optional rather than forced. Currently, Fabric remembers the workspaces and items that were open in my previous session...TeemuMultanen5 hours agoAdvocate INew261Views42likes1CommentWhy are Calculation Groups so hard to modify?
Is there a way to make it easier to modify the DAX in a calculation group? I'm not sure if it's just me that finds this so annoying, but perhaps it's because I just started using calculation groups. ...AaronReasoner6 hours agoNew MemberNew5Views0likes0CommentsFeature Request: Add a Warning Prompt Before Deleting Tables That Contain Measures
Problem Statement: In Power BI, measures are linked to specific tables. When a developer deletes a table from the model view or report view, Power BI automatically deletes all measures assigned to ...Murtaza_Ghafoor9 hours agoSuper UserNew16Views2likes0Comments