Project Online - Enterprise Project types

I am working through the implementation of the Project Online Power BI connection pack and I am struggling with establishing how Project Types are maintained with the Project Online dataset:

 

Project type.png

 

 

 

As above - PowerBI only sees one Project Type, 'Basic Project' (Note this was previously called Enterprise Project but I renamed it as part of a test to see that changes in Project Online were pulling through to PowerBI)

 

Following these instructions:  https://ppmworks.com/changing-the-enterprise-project-type/   I split my 26 projects into four different types and on checking within Project Online, they appear to have changed (The Choose Enterprise Project Type drop-down has four options to choose from plus the original 'Basic Project') : 

 

actualtypes.png

 

However after Refreshing the data into PowerBI, all Projects remain in the 'Basic Project' type.  

 

When I look at the PowerQuery editor, it appears that Project Type is a pass through HEX code from Project Online and confirms that all projects get loaded with same code:

 

ProjectID2.png

 

After summarising all this, I realise that this may be more a Project Online question rather than a PowerBI question but would appreciate if anyone can explain how all this works so that I can try and edit the projects to be in specific groups (ideally without removing all the data and starting again!) 

 

many thanks in advance for any help.... 

1 ACCEPTED SOLUTION
Anonymous
Not applicable

Hi @Anonymous,

Power bi data connectors are based on corresponding rest API, so if these change name operations did not affect the root project names, these changes should not update to the power bi side.

I'd like to suggest you add a custom table to the power bi side which maps keys and names for the project objects. Then you can add a custom column to the raw table to reference the new name from the custom table for the following report design usage.

Regards,

Xiaoxin Sheng

View solution in original post

1 REPLY 1
Anonymous
Not applicable

Hi @Anonymous,

Power bi data connectors are based on corresponding rest API, so if these change name operations did not affect the root project names, these changes should not update to the power bi side.

I'd like to suggest you add a custom table to the power bi side which maps keys and names for the project objects. Then you can add a custom column to the raw table to reference the new name from the custom table for the following report design usage.

Regards,

Xiaoxin Sheng

Helpful resources

Announcements
Power BI DataViz World Championships

Power BI Dataviz World Championships

The Power BI Data Visualization World Championships is back! Get ahead of the game and start preparing now!

December 2025 Power BI Update Carousel

Power BI Monthly Update - December 2025

Check out the December 2025 Power BI Holiday Recap!

FabCon Atlanta 2026 carousel

FabCon Atlanta 2026

Join us at FabCon Atlanta, March 16-20, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.