Forum Discussion
data model design
- 2 years ago
If your question is regarding timings, you have a séquentiel order. First, conceptual model design to be done by 2/3 modelers (outside pbi) , second, the creation of the model by 1 développer, third testing/enhacements/documention by à second dev when the work of dev 1 is complète.
How ? You have different options : Shared pbix or pbip between dev or using Tabular Editor connected to xmla.
If it answers your query please mark my solution as the solution
my recommendation would be to have the 3 developers work together to frame the conceptual model and best practices to put in place to answer the reporting needs (harvest collective intelligence). 1 will build the model, another will be in charge of testing, ajustments (referential integrity, Power Query modif etc) and documentantation, the third person can start working on the visual reporting or if you have specific developpers for the front end, ensure the tight connection to that person.
- powerbiexpert222 years agoImpactful Individual
Hi Alex87 , how 2 person work on same data model as you meantioned 1 will build the data model and another will be charge of testing , as per my understanding both shuld be done by only 1 person