Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Calling all Data Engineers! Fabric Data Engineer (Exam DP-700) live sessions are back! Starting October 16th. Sign up.
Hello,
I am trying to figure out a way to have my forecast line, burndown cumulatively at an X increment, chosen by the parameter. Right now my forecast line is a static flat line based on my parameter input. How can I replace my dark blue line, and make a cumulative burndown that looks more like the green line pictured below?
onedrive link to download .PBIX: https://1drv.ms/u/s!AtSwg5qn5C4CbEat8g14quBDdCk
Refer if this can help
https://community.powerbi.com/t5/Desktop/Burndown-chart-for-data-progress/m-p/89026
Appreciate your Kudos. In case, this is the solution you are looking for, mark it as the Solution. In case it does not help, please provide additional information and mark me with @
Thanks. My Recent Blog -
Winner-Topper-on-Map-How-to-Color-States-on-a-Map-with-Winners , HR-Analytics-Active-Employee-Hire-and-Termination-trend
Power-BI-Working-with-Non-Standard-Time-Periods And Comparing-Data-Across-Date-Ranges
Connect on Linkedin
Join the Fabric FabCon Global Hackathon—running virtually through Nov 3. Open to all skill levels. $10,000 in prizes!
Check out the September 2025 Power BI update to learn about new features.